(Tele-) Oracle Augmented Sensor Totems

#22 | Wed 28 May 2025

Had a productive day today at the workshops. Picked up the package from Kiwi Electronics and moved all electronics and devices stored in OK26 back to the studio so I can work on it during Ascension and Pentecost.

2 sculptures painted

Welded a 3rd sculpture. This will be the one for the phone tower.

Prepared some helper tools so that I can hopefully weld the 4th sculpture on Monday in one go and very maybe paint it before Tuesday!